Opening a Second Clinic Branch in the UAE: Licensing, Staff and Budget
Short answer: Opening a second clinic branch in the UAE means licensing a second healthcare facility, not adding an address to your first licence. Each regulator (DHA in Dubai, DOH in Abu Dhabi, SHA in Sharjah, DHCC in Dubai Healthcare City) takes the new site through its own approval, layout, inspection and operating licence. Once both sites are licensed, you can link them as a group so a medical director and staff can work across both, within the rules.
Last verified: October 2026 against the DHA Manual for Licensing Health Facility (Version 1.2, effective 30 September 2026), DHA circular CIR-2016-SHN0690, the DOH Standard for Healthcare Facility Licensure (V6), SHA and DHCC service pages, and the ADDED business setup guide.
Key Takeaways
- Plan your second clinic branch as a new facility licence: approval, approved layout, inspection and activation for that address.
- The branch entry on your trade licence and the health facility licence are two separate tracks. You need both.
- In Dubai, one medical director can cover several facilities in the same Sheryan group, but not a facility outside that group.
- Staff can only rotate between sites once the facilities are grouped, the service exists at both, and malpractice cover includes every branch.
- Most regulators do not publish a single fee for a clinic licence, so budget from live quotes, not old package prices.

Two Licences, Not One
Every clinic owner we speak to about a second site asks the same thing first: can we just add the new address to the licence we already have? In practice, no. There are two tracks running side by side.
The economic authority (DET in Dubai, ADDED in Abu Dhabi, the free zone authority for DHCC) deals with the company, trade name, activity and legal form. ADDED’s own setup guide says its process covers starting “a new company or off-shoot an existing business”, and that the Department of Health is one of the extra approvals a healthcare activity needs. Whether a branch legal form suits your clinic depends on your current entity, ownership and activity, so confirm it with the authority before you sign anything.
The health regulator deals with the clinical premises: services, layout, equipment, staff and patient safety. DHA’s licensing manual ties a facility licence to its location, and both DHA and SHA run separate services for adding an already licensed facility to a group. That only works if each site holds its own licence. So the safe plan is a full facility licence for the new address.
How the Facility Process Compares
| Regulator | Route for the New Site | Main Readiness Points | Published Timing and Fees |
|---|---|---|---|
| DHA (Dubai mainland) | New Facility License in Sheryan (issued as inactive), then Activate Facility License | Makani location, Ejari, layout from a prequalified design consultant, trade licence, medical director, enough professionals, Civil Defence, waste and insurance contracts, NABIDH connectivity, DHA inspection | Inactive licence valid for 1 year; the manual mentions fees but gives no amounts |
| DOH (Abu Dhabi) | Preliminary approval, then permanent licence, both through TAMM | Trade name certificate from the economic department, engineering drawings, 90% and 100% inspections, malpractice insurance, pest control contract, DED trade licence, MCC and Malaffi approvals | DOH aims for 20 working days for preliminary approval and 25 for the permanent licence; preliminary approval lasts 6 months; no licence fee figure in the standard |
| SHA (Sharjah) | Initial approval, then final (permanent) licence | Stamped layout, WEQAYA waste registration, trade licence, medical director form, building completion certificate, emergency plan approval, equipment list, FANR licence if relevant, SHA inspection | Service time of 8 working days; final licence valid for one year; fee “depending on the type of facility” |
| DHCC (Dubai Healthcare City) | Commercial branch or entity setup, then initial application, provisional approval, design review and pre-operational assessment | Business plan, branch resolution and parent company documents, design and construction review, pre-operational assessment | One time commercial setup fees published in the AED 1,500 to 3,500 range; clinical licence fees as per the DHCR price list |
Times are the regulators’ own service targets. Your real timeline depends far more on fit out, approvals from other departments and how ready the site is on inspection day.
Medical Director and Group Rules in Dubai
DHA’s manual (section 13.3) says “a medical/clinical director may be appointed for multiple facilities that are part of the same group registered in Sheryan.” The conditions matter: both facility licences must be active, the person must meet the medical director requirements and hold an active licence, and they must not be medical director of another facility outside the group. DHA also says the post must not stay vacant for more than two weeks.
The 2026 manual adds a chapter on facility groups. You can create a group and add a facility “provided they have the same ownership”, with DHA approval. Professionals may then work within the group’s facilities as long as the facility specifies the locations. A few limits to plan around:
- The service the professional provides must exist at the branch.
- Rotating staff must not take either site below its minimum staffing.
- The group malpractice insurance must cover the rotating professionals.
- A part timer whose main full time licence is outside the group cannot be added.
DHA’s older circular on moving doctors between branches of the same owner says the same in shorter form, and excludes Registrar and Under Supervision titles, expired licences and DHCC practice.
Staff Moves in Abu Dhabi, Sharjah and DHCC
In Abu Dhabi, the DOH standard has a staff rotation service for “facilities of the same owners or partners”. Every specialty in the rotation must be available in every facility included, and the rotation is cancelled if ownership changes. DOH eServices also list secondment and part time permits for professionals.
In Sharjah, SHA has a service to add a facility to an existing group and a part time licence for a professional who already holds a full licence at another SHA facility. SHA’s licence transfer service is marked as still under implementation, so check its status before you plan around it.
In DHCC, a professional can add an employer when they hold a valid DHCC licence, have an offer letter from the new facility, the service is approved there and malpractice insurance covers the new practice. DHCC states 10 working days for this.
Whatever the emirate, map each person before opening day: their main facility, branch hours, the regulator action needed, insurance cover, privileges and start date. Don’t build a rota that needs one clinician in two places at once.
Before You Sign the Lease
- Confirm the activity and legal form the economic authority will accept for the second clinic branch.
- Check the unit can take the layout your facility type needs, including the accessibility rules DHA applies.
- Make sure the landlord allows medical use and the building works you’ll need.
- List the outside approvals: Civil Defence, municipality, waste, and FANR if you plan imaging.
- Sequence it: trade name, regulator approval, lease, design, fit out, inspection, activation.
Budget Beyond the Licence Fee
The regulator fee is one small line. A realistic second clinic branch model covers setup (deposits, rent, design, fit out, equipment, IT, signage, first stock), compliance (inspections and re-inspections, contracts, malpractice insurance, systems), people (recruitment, licensing actions, pre-opening payroll) and working capital while patient numbers build.
Revenue timing is where most branch plans go wrong. Your first clinic’s insurer agreements may not cover the new address, specialties or clinicians. Confirm network contracting, credentialing, prices and claims setup for the branch, and don’t forecast insured revenue until each payer confirms the branch can submit claims. Shared finance, HR, purchasing and billing can save money, but keep site level control of cash, stock, incidents and daily staffing.
A second site is easier to justify when the first clinic makes steady cash, runs without the owner on every shift and the new area has clear demand. Test what happens if opening, insurer approval or hiring slips by three to six months, and decide how much cash you can commit without weakening the first clinic.
Frequently Asked Questions.
Does a second clinic branch need its own health facility licence?
Plan on yes. DHA, DOH, SHA and DHCC each license the facility at its location, with its own layout approval and inspection. A branch on your trade licence does not replace that.
Can the same doctor work at both of my Dubai clinics?
Yes, if both facilities are in the same Sheryan group under the same ownership, the service exists at both sites, minimum staffing is kept at each and the group malpractice insurance covers the doctor. Registrar and Under Supervision titles are excluded.
Does each clinic branch need a separate medical director?
Not in Dubai, where one medical director can cover several facilities in the same Sheryan group, as long as they are not medical director anywhere outside it. SHA requires a licensed medical director and, for some facility types, a technical supervisor at final licensing, so confirm the arrangement for your site.
How long does it take to license a second clinic in Abu Dhabi?
The DOH standard targets 20 working days for preliminary approval and 25 working days for the permanent licence, with inspections in between. Fit out and outside approvals usually take far longer than the licence steps themselves.
How much does a second clinic licence cost?
DHA, DOH and SHA do not publish one complete figure for a clinic licence. DHCC publishes its one time commercial setup fees, in the AED 1,500 to 3,500 range, with clinical licence fees on its price list. Get live quotes, then add design, fit out, systems, staff, insurance and working capital.
Where This Comes From.
- DHA Manual for Licensing Health Facility (Version 1.2, effective 30 September 2026)
- DHA Circular CIR-2016-SHN0690: Physicians Transfer Between Branches of a Mother Group
- DOH Standard for Healthcare Facility Licensure (V6, 2025)
- DOH eServices
- SHA: Permanent License Service
- SHA Services Directory
- DHCC: Apply for New Commercial License
- DHCC: Business FAQ (facility setup steps)
- DHCC: Add Employer
- ADDED: Establish Your Business
How OzaniX Partners Can Help.
A second site touches licensing, finance and people at the same time, and that’s where we help clinic owners most. Our M&A and Expansion Strategy team builds the branch business case, budget and cash forecast, while our Licensing and Regulatory team runs the facility licence, group set up and staff moves with DHA, DOH, SHA or DHCC, so the new clinic opens on a date you can plan around.